Roadmap beta, small-run, and large-run (if applicable).
+
(This serves as an unorganized list of thoughts about project development. It may be fleshed out into a proper document at some point, but currently does not serve as anything more than tidbits of "wisdom".)
Define what the Minimum Viable Product (MVP) looks like at each of these stages.
+
 
Define manufacturing processes for beta, small-run, and large-run. (Generally: additive, subtractive, formative, other.)
+
=== Development considerations ===
Determined your Mean Time To Failure (MTTF).
+
* Roadmap beta, small-run, and large-run (if applicable).
Investigate supply chains early.
+
* Define what the Minimum Viable Product (MVP) looks like at each of these stages.
Limit scope creep.
+
* Define manufacturing processes for beta, small-run, and large-run. (Generally: additive, subtractive, formative, other.)
 +
* Determined your Mean Time To Failure (MTTF).
 +
* Investigate supply chains early.
 +
* Limit scope creep.

Latest revision as of 15:22, 6 February 2018

(This serves as an unorganized list of thoughts about project development. It may be fleshed out into a proper document at some point, but currently does not serve as anything more than tidbits of "wisdom".)

Development considerations

  • Roadmap beta, small-run, and large-run (if applicable).
  • Define what the Minimum Viable Product (MVP) looks like at each of these stages.
  • Define manufacturing processes for beta, small-run, and large-run. (Generally: additive, subtractive, formative, other.)
  • Determined your Mean Time To Failure (MTTF).
  • Investigate supply chains early.
  • Limit scope creep.